ScapeToolbox
HYDRAULIC ENGINEERING SUBMITTAL
Pressure Budget & Pipe Velocity Audit
Required + safety: 44.00 PSI
Surplus / deficit: -13.74 PSI
Stage-by-stage pressure budget
| Stage | Standard (PSI) | Design loss (PSI) | Basis | Remaining (PSI) |
|---|---|---|---|---|
| POC Static | — | — | Input | 60.00 |
| Meter | 1.94 | 1.94 | Standard / formula | 58.06 |
| Service line | 0.65 | 0.65 | Standard / formula | 57.41 |
| Backflow | 9.26 | 9.26 | Standard / formula | 48.15 |
| Headworks | 2.00 | 2.00 | Standard / formula | 46.15 |
| Mainline | 1.05 | 1.05 | Standard / formula | 45.10 |
| Zone valve | 3.12 | 3.12 | Standard / formula | 41.98 |
| Lateral & fittings | 6.53 | 6.53 | Standard / formula | 35.45 |
| Elevation | 5.20 | 5.20 | Standard / formula | 30.26 |
Fittings: 12% of pipe friction · Required operating pressure: 40.00 PSI · Safety reserve: 10%.
Component basis: meter: standard curve · backflow: standard curve · master: standard curve · filter: standard curve · valve: standard curve
Pipe velocity audit
| Segment / Material | Nominal / ID | Length | Flow | C | Velocity | Loss (PSI) | Audit |
|---|---|---|---|---|---|---|---|
| Service line PVC Schedule 40 | 1¼″ / 1.380 in | 35.0 ft | 18.00 GPM | 150 | 3.86 ft/s | 0.65 | PASS |
| Mainline 01 PVC Schedule 40 | 1½″ / 1.610 in | 120.0 ft | 18.00 GPM | 150 | 2.84 ft/s | 1.05 | PASS |
| Critical lateral PVC Schedule 40 | 1″ / 1.049 in | 80.0 ft | 18.00 GPM | 150 | 6.68 ft/s | 5.65 | FAIL |
Pressure waterfall
Engineering recommendations
Upsize Critical lateral: 1″ → 1¼″: 3.86 ft/s, recovering 4.66 PSI.
Split the zone: At 50% flow, estimated recovery is 9.11 PSI; available pressure becomes 39.37 PSI. Recheck component catalog curves.
Review booster pump / supply pressure: Current deficit is 9.74 PSI before the safety reserve. Pipe upsizing alone may be insufficient; verify dynamic supply pressure and pump duty.
Engineer verification: ____________________________ Date: __________________
Calculated using Hazen-Williams and industry-average component curves. Verify dynamic supply pressure, manufacturer catalog values, local codes and field conditions. This report is not a stamped engineering design.
Generated by ScapeToolbox · scapetoolbox.com